cable drag chains
soft tube series
machine shield
scrap-excluding conveyer and chain
tools and measure
machine lamps
operational piece
door handle series
type-t slot plate scraping plate series
adjustable plastic cooling pipe

Weight bearing plastic towline series for project
Installation introducton
Characteristic:Weight bearing,long working distance,easy to be installed and dismantled,high speed running,and very long working life.
Step1.With regard to dismantling the closed style weight
bearing towline,firstly you should insert a flat-mouth
screwdriver into the hatch place of the top cover,push
down and then the top cover is dismantle.
Step2.At that time it becomes bridge style towlne;Insert a flat-mouth screwdriver into the hatch place of the top shank sideling,push down slightly.Both ends of the shank need to be pried.
Step3.One the base of prying,you may push forward by
force, then the top shank could be taken down.
Step4.After that,use a sharp-mouth plier to nip the towline's bolt,after the bolt combined,push adown uprightly,take the bolt down.
 
Step5.When finishing removing the bolt,insert the
screwdriver into the joint of the two slices on the towline
side,press to one side slghtly and it the could be taken our.